Skip to content

Sourcing

Low vs High MOQ: How to Choose Your First Factory

August 18, 2026 · DONGFAN Team

Low vs High MOQ: How to Choose Your First Factory

Garment sewing floor at DONGFAN's factory

Low and high MOQs solve different operating problems. A lower opening quantity can preserve flexibility while a brand is still defining a style or testing a sales channel; a larger commitment may make more sense when the product, demand and replenishment plan are already understood. The useful comparison is not a generic factory benchmark. It is the relationship between order volume, cash flow, product confidence and the scope a supplier can actually produce.

1. Start with the uncertainty you are managing

A first launch usually contains open questions: which style will carry the collection, how many sizes to offer, what fabric direction is viable and when the brand needs stock. A lower MOQ can reduce the amount of inventory committed before those questions have been tested, but it still requires a defined style and production-ready inputs.

A higher quantity can be appropriate when the brand has a clearer demand signal, a stable design and the operational capacity to receive and sell the inventory. Neither approach is automatically better. The decision should match the amount of product and demand uncertainty that remains.

  • Confidence in the style and demand
  • Cash available for deposit, balance and inventory
  • Storage, fulfilment and sales-channel readiness
  • Ability to manage a larger size and colour range

2. Compare scope, not only unit quantity

MOQ should be discussed together with fabric, colour direction, size allocation, trims and construction. A quantity that is workable for one simple style may need a different review for a complex garment, custom material or many colour options. Ask the supplier to state the assumptions behind feasibility before comparing quotations.

At DONGFAN, the standard MOQ is 100 pieces per style. Use that as a starting point for a specific brief, then confirm how selected materials, development work and production requirements affect the plan. This avoids comparing an apparent quantity alone while the production scope remains different.

  • MOQ per style and any material constraints
  • Number of colour directions and size allocation
  • Sample and development work required
  • What is included or needs separate confirmation

3. Decide what should change before the next order

A first production run should create better information for the next decision. Record which style, colour, size and material choices were approved; retain the final brief and sample references; and identify any changes needed before another production discussion. This creates a more useful basis for a future reorder or a larger commitment.

If the brand is ready to scale, start by confirming current material availability, the approved specification and the target delivery window. DONGFAN generally plans bulk production for 4–8 weeks after approval, depending on order quantity. The specific schedule should be confirmed for the next order rather than inferred from a previous run.

  • Keep approved specifications and sample references
  • Review material availability before reordering
  • Confirm any style, colour or size changes in writing
  • Request a project-specific production schedule

FAQs

Is a 100-piece MOQ suitable for a first launch?

It can be a practical starting point for one clearly defined style. Feasibility still depends on the selected material, construction, colours and size allocation.

When can a larger order make sense?

A larger order may be appropriate when the style, demand, operational capacity and replenishment plan are more established.

What should I compare between supplier quotes?

Compare the same style scope, quantity, material direction, colour and size assumptions, sample work and requested timing.

Compare your production options →

Planning a collection?

Book a free 30-min sourcing consultation, or send your brief for a 24-hour FOB quote.